At Diamond Construction LTD, we always have our hands full with work. This project is still under construction, though we've already made significant progress and everything is progressing in a timely manner. We've already finished the 20x10m basement that served as the basis for the three flats we are currently building on top of it. Additionally, we've finished excavation work on another, 20x10m basement that will serve as additional space for the building. We still intend to add all the important installations to it, as well as a delta membrane system to prevent water and moisture from getting in.